Skip to content
(306) 244-2407main@prairiewaste.ca
Prairie Waste
Menu

Meeting your contaminant soil reclamation needs

We are your petroleum hydrocarbon impacted soil treatment facility.

Dump truck unloading soil

Easy soil delivery

Our landfarm facilities are located near Saskatoon, SK. Information and directions to each facility are provided here. PWML personnel will be on site to greet drivers and direct delivery of materials for each truck load.

Gloved hands sampling soil into a bag

Soil testing

All soil disposed of at our facilities require laboratory analysis prior to delivery. All PWML Requirements are listed here. PWML also performs annual sampling of soil stored on site to monitor and track remedial activities.

Hand holding a water sample tube over rippling water

Groundwater testing

PWML performs annual groundwater monitoring and sampling at each PWML facility. Sampling is undertaken to ensure that local groundwater is not affected as a result of remedial activities on site.

Downloads

A SDA form must be filled out and presented to PWML along with laboratory analytical results as the first step in the soil acceptance process.

  1. 1Soil Disposal Application (SDA)June 2014
  2. 2Soil Disposal Application InstructionsJune 2014
  3. 3PWML Facility – Soil Disposal CriteriaDecember 2014
  4. 4PWML Soil Docket Form-2014January 2014

All downloads